Get a Free Quote (416) 474-9856
GTA PERMITS
(416) 474-9856GET A FREE QUOTE

Building Permits in Toronto

Permit drawings, applications, and city coordination for residential projects across every ward in the City of Toronto. We know Toronto Building inside and out.

Toronto Building Permits — From Drawings to Approval, Handled.

Toronto is the largest and most active building permit market in the GTA — and the most complex. The City of Toronto operates the biggest municipal building department in Ontario, with its own digital submission portal, its own examination process, and its own interpretation of the Ontario Building Code. Getting a permit in Toronto is not the same as getting one in Vaughan, Mississauga, or Brampton.

GTA Permits has submitted hundreds of residential building permit applications to Toronto Building. We know the intake process, the portal system, the examination timelines, and the individual tendencies of Toronto examiners. We prepare drawings and applications specifically for Toronto — not generic packages that need to be reworked after the first round of comments.

Key Facts — Toronto

  • Portal: Toronto Building Intake Portal
  • Zoning: Zoning Bylaw 569-2013
  • Typical timeline: 8 to 14 weeks
  • We submit to Toronto regularly
  • All examiner correspondence handled
  • Engineering coordination included

What You Need to Know About Building Permits in Toronto

Submission Portal

Toronto Building Intake Portal

Toronto requires digital permit applications submitted through its online Intake Portal. All drawings must be in PDF format and meet specific size, resolution, and naming conventions. Applications can also be submitted via email to bldapplications@toronto.ca.

Zoning Bylaw

Zoning Bylaw 569-2013

Toronto’s primary zoning instrument consolidates most of the city’s land use regulations. It governs setbacks, lot coverage, building height, and uses across the entire city.

What Makes Toronto Unique

Toronto is the only GTA municipality that requires Heritage Planning approval for exterior changes to properties in heritage conservation districts — a separate process that runs in parallel with the building permit.

Neighbourhoods We Serve in Toronto

East York Scarborough North York Etobicoke York Downtown Toronto

Don’t see your neighbourhood? Contact us — we serve all of Toronto.

Our Permit Services in Toronto

Frequently Asked Questions — Building Permits in Toronto

How long does it take to get a building permit in Toronto?+
Toronto Building examination timelines for residential permits typically range from 8 to 14 weeks for initial review. After that, most applications receive examiner comments requiring revisions — which add additional weeks. Total timeline from submission to permit issuance is commonly 12 to 20 weeks for residential projects.
How do I submit a building permit application in Toronto?+
Toronto requires digital submissions through the Toronto Building Intake Portal or via email to bldapplications@toronto.ca. All drawings must be in PDF format with specific naming conventions and file size requirements. We handle the complete submission process on your behalf.
How much does a building permit cost in Toronto?+
Toronto Building charges permit fees based on the estimated construction value and the type of work. Fees for residential projects typically range from a few hundred dollars for simple decks to several thousand dollars for additions and new builds. Municipal permit fees are separate from our professional fees.
Do I need a permit for a basement apartment in Toronto?+
Yes. Converting a basement to a legal secondary suite in Toronto requires a building permit. The drawings must demonstrate compliance with fire separation, egress, ceiling height (1.95m minimum), and independent HVAC and plumbing requirements.
My property is in a heritage district. Can I still get a building permit?+
Yes, but exterior changes require Heritage Planning approval in addition to the building permit. Heritage approval runs as a separate process — we identify heritage requirements before drawings begin and coordinate both approvals in parallel.

Start Your Toronto Permit Today

Tell us your property address and what you want to build. We will confirm what is required in Toronto and give you a quote — no obligation.